Your Online Estimating Service “Just For You”

Estimate Packages

Each package provides different information. To help you decide which package works for you:

Estimate A: Provides Estimate with details of trades required, services performed and the lump sum amount.

Estimate B: Provides Estimate with trades required, services performed, labor cost, and material cost.

Estimate C: Provides Estimate with material and labor costs, Best Value (in Red) provides complete comprehensive estimate including material, trade and service, the contractor’s profit (15% industry standard) and stock list.

How to get your online estimate started:

1.) Choose your category from icon on the "Home" page and provide a brief description of your intended vision (scope of work)
2.) Provide measurements required (height, width, and length)
3.) Describe your project and include the state your work is being performed in the heading
4.) Take a minimum of 6 pictures from all angles- top, bottom, both sides (left and right), front, back

Estimate A

BEST VALUE

Estimate C

Includes: Includes: Includes:

Details of Trades Required

Details of Trades Required

Details of Trades required

Details of Services Performed

Details of Services Performed

Details of services preformed

 Lump sum
(Total of job)

Details of Labor Cost

Details of labor cost

 

Details of Material Cost

Details of material cost

   

Complete stock list

(10 credits)

INCLUDED

(20 credits)

INCLUDED

(50 credits)

INCLUDED

$20.00

$49.00

$99.00

 

Ask Attorney General Construction is your construction project resource for ALL of your online estimating needs.
Created, operated and owned by contractors

"Practicing Construction Intelligence Daily"

Ten free credits when you register on this site

Copyright © 2013 AGC Attorney General Construction, Inc

Follow Us

“CREATED, OPERATED, AND OWNED BY CONTRACTORS”